44r0n7andClaude Opus 5.5 a712e51b96 Board: t21 to Review with its report; new tasks t29, t33-t36; board updates
- t21 report and subtasks ticked.
- New Todo tasks: t33 telling solid ground from loose grains, t34 nozzle blow reach, t35
  diagonal screw tubes, t36 diagonal wall blocks with a sloped face; t29 added on the board.
- The owner's board edits since the last board commit.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-24 22:51:27 -04:00

22 lines
884 B
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
id: t35
title: Diagonal screw tubes
status: Todo
created: 2026-10-25
updated: 2026-10-25T02:35:19Z
---
## Context
- Screw tubes only run straight: up, down, left or right. Add diagonal tubes, and let them be placed diagonally (dragging a line at 45° lays a diagonal run), so grains and bars can be carried up or down a slope without stair-stepping straight pieces.
## Subtasks
- [ ] Decide how a diagonal tube looks and fits the 4×4 block grid (a block per diagonal step, or a dedicated diagonal piece)
- [ ] Move grains and bars along diagonal tubes, including joining onto and off straight tubes and belts
- [ ] Placing: dragging at 45° lays a diagonal run; R picks the diagonal directions when placing a single piece
- [ ] Copy, cut, paste, undo and blueprints handle diagonal tubes
- [ ] Tests for carrying sand and bars up and down a diagonal run, and for the joins