- t21 report and subtasks ticked. - New Todo tasks: t33 telling solid ground from loose grains, t34 nozzle blow reach, t35 diagonal screw tubes, t36 diagonal wall blocks with a sloped face; t29 added on the board. - The owner's board edits since the last board commit. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
884 B
884 B
id, title, status, created, updated
| id | title | status | created | updated |
|---|---|---|---|---|
| t35 | Diagonal screw tubes | Todo | 2026-10-25 | 2026-10-25T02:35:19Z |
Context
- Screw tubes only run straight: up, down, left or right. Add diagonal tubes, and let them be placed diagonally (dragging a line at 45° lays a diagonal run), so grains and bars can be carried up or down a slope without stair-stepping straight pieces.
Subtasks
- Decide how a diagonal tube looks and fits the 4×4 block grid (a block per diagonal step, or a dedicated diagonal piece)
- Move grains and bars along diagonal tubes, including joining onto and off straight tubes and belts
- Placing: dragging at 45° lays a diagonal run; R picks the diagonal directions when placing a single piece
- Copy, cut, paste, undo and blueprints handle diagonal tubes
- Tests for carrying sand and bars up and down a diagonal run, and for the joins