Files
deepgrain-foundry/tasks/t35_diagonal_screw_tubes.md
T
44r0n7andClaude Opus 5.5 a712e51b96 Board: t21 to Review with its report; new tasks t29, t33-t36; board updates
- t21 report and subtasks ticked.
- New Todo tasks: t33 telling solid ground from loose grains, t34 nozzle blow reach, t35
  diagonal screw tubes, t36 diagonal wall blocks with a sloped face; t29 added on the board.
- The owner's board edits since the last board commit.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-24 22:51:27 -04:00

884 B
Raw Blame History

id, title, status, created, updated
id title status created updated
t35 Diagonal screw tubes Todo 2026-10-25 2026-10-25T02:35:19Z

Context

  • Screw tubes only run straight: up, down, left or right. Add diagonal tubes, and let them be placed diagonally (dragging a line at 45° lays a diagonal run), so grains and bars can be carried up or down a slope without stair-stepping straight pieces.

Subtasks

  • Decide how a diagonal tube looks and fits the 4×4 block grid (a block per diagonal step, or a dedicated diagonal piece)
  • Move grains and bars along diagonal tubes, including joining onto and off straight tubes and belts
  • Placing: dragging at 45° lays a diagonal run; R picks the diagonal directions when placing a single piece
  • Copy, cut, paste, undo and blueprints handle diagonal tubes
  • Tests for carrying sand and bars up and down a diagonal run, and for the joins