Files
Project-Kiln/docs/phase-1/evidence-completion-2026-07-18.md
T

20 lines
1.3 KiB
Markdown

# Phase 1 completion evidence
- Date: 2026-07-18
- Requirement IDs: R-009, R-012, R-016, R-018, R-024, R-029
- Phase/gate: phase 1 / provider-independent contract completion
- Scope: provider/runtime capability interfaces, typed dry-run launch plans, lifecycle
confidence policy, structured versioned errors, fixed-precedence versioned TOML with
provenance, deterministic mock scenarios, and versioned CLI machine output
- Exclusions: real providers, process execution, daemon or IPC, discovery cache, GUI,
session supervision, installation management, public stability, and final naming
- Commands: `make verify`; `make audit`; `cargo test --workspace --all-targets --locked`;
human and JSON `kiln doctor` smoke paths; structured CLI error smoke paths
- Expected result: all required Phase 1 mock outcomes and hostile inputs are covered;
schemas reject unknown versions and fields; launch arguments never require a shell;
lifecycle effects degrade conservatively; configuration precedence is deterministic
- Observed result: 40 unit, contract, adversarial, persistence, concurrency, mock, and
isolated CLI integration tests passed; formatting, compilation, Clippy with warnings
denied, dependency policy, source inventory, schema reports, and smoke checks passed
- Result: pass