Far sidewall drawn behind the load with cleat ribs at their physics positions; sloped screens get a tinted mesh between rails and shake only when loaded. Powder skips cleat checks outside chunks that have cleats, and empty slopes let their chunks sleep. Record the screw conveyor and stall/carry-depth decisions. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>