Board: t21 to Review with its report; new tasks t29, t33-t36; board updates

- t21 report and subtasks ticked.
- New Todo tasks: t33 telling solid ground from loose grains, t34 nozzle blow reach, t35
  diagonal screw tubes, t36 diagonal wall blocks with a sloped face; t29 added on the board.
- The owner's board edits since the last board commit.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
2026-10-24 22:51:27 -04:00
co-authored by Claude Opus 5.5
parent 7a653d94b4
commit a712e51b96
30 changed files with 204 additions and 79 deletions
+21
View File
@@ -0,0 +1,21 @@
---
id: t35
title: Diagonal screw tubes
status: Todo
created: 2026-10-25
updated: 2026-10-25T02:35:19Z
---
## Context
- Screw tubes only run straight: up, down, left or right. Add diagonal tubes, and let them be placed diagonally (dragging a line at 45° lays a diagonal run), so grains and bars can be carried up or down a slope without stair-stepping straight pieces.
## Subtasks
- [ ] Decide how a diagonal tube looks and fits the 4×4 block grid (a block per diagonal step, or a dedicated diagonal piece)
- [ ] Move grains and bars along diagonal tubes, including joining onto and off straight tubes and belts
- [ ] Placing: dragging at 45° lays a diagonal run; R picks the diagonal directions when placing a single piece
- [ ] Copy, cut, paste, undo and blueprints handle diagonal tubes
- [ ] Tests for carrying sand and bars up and down a diagonal run, and for the joins